E44-905 · Siphon and Backflow · Siphon Pipe · ★★
Air leakage, loss of suction, stoppage
[Mechanism] Leakage at pipe flanges/welds draws in air, reducing the vacuum until the liquid column breaks.
[Calculation] A leak hole of diameter d=2 mm draws in about 0.5 m³/h at -0.08 MPa, dropping the vacuum from 9 m to 6 m in 30 min and breaking the flow.
[Design Omission] Flanges not tightened, gaskets aged, and welds not leak-tested.
1) Tighten the flanges to the specified torque (bolt torque meeting the PN16 requirement), because a loose gap draws in air under vacuum while tightening keeps the gap <0.05 mm and leak-free, thereby keeping the seal and maintaining the vacuum;
2) Replace the gasket with corrosion-resistant rubber/PTFE (the original asbestos aged and cracked), because the old gasket loses elasticity and leaks while the new one springs back and seals, thereby closing the leak path;
3) Do dye-penetrant plus airtightness testing on the welds (0.6 MPa hold pressure, no bubbles), because pinholes draw in air under vacuum and testing locates them for repair welding, thereby eliminating the leak point;
4) Change the pipe sections to socket welds to reduce the number of flanges (from 12 to 4), because flanges are the main leak source and fewer of them mean fewer leak points, thereby reducing the probability of air leakage;
5) Install a vacuum alarm (alarm <7 m), because air leakage makes the vacuum fall gradually, earlier than a stoppage, thereby monitoring the vacuum for early warning;
6) Run a vacuum-hold test (stop the pump and check the vacuum drop is ≤0.5 m in 30 min), because the design missed the leak test and the measurement confirms the leak rate, thereby judging the seal on data;
7) Prohibit flexible flange connections in the vacuum zone (switch to welded bellows), because flexible connections loosen and leak while welding is stable, thereby preventing leaks in high-risk sections;
8) Write the flange tightening torque and airtightness into the assembly checklist, because the root cause of lost suction is an uncontrolled leak, thereby the assembly controls it to prevent leakage-related stoppage.
GB/T 20801.3-2020 Design code for industrial metallic piping