Siphon Interruption Causing Material Starvation

E44-911 · Siphon and Backflow · Siphon System · ★★

Problem Description

Interruption, material starvation, stoppage

Root Cause

[Mechanism] The level on the supply side drops below the inlet, air is drawn in and the flow breaks, starving the downstream process.
[Calculation] The minimum level in the supply tank is 0.15 m, 0.4 m below the inlet, so the inlet is exposed and the flow breaks; a safe level requires ≥0.7 m.
[Design Omission] No minimum level set, no interlocked make-up feed, and no low-level alarm.

Corrective Solution

1) Set a minimum level so that H_min ≥ the inlet +0.3 m (the original 0.15 m is insufficient), because the inlet must stay submerged to draw liquid and breaks as soon as it is exposed, thereby keeping it submerged and maintaining the vacuum;
2) Interlock a make-up pump below the supply tank (start at the low limit, stop at the high limit), because withdrawal outstrips feed and empties the tank while make-up holds the level, thereby preventing starvation from an empty tank;
3) Add a vortex breaker (cross baffle) at the inlet, because low levels generate vortices that entrain air while the breaker breaks the vortex and suppresses air entrainment, thereby keeping suction stable even at low level;
4) Add a tank-wall level gauge with low-level alarm (alarm at ≤0.7 m), because the level falls gradually before the break, allowing early make-up, thereby monitoring the level and preventing sudden starvation;
5) Limit the discharge-valve flow velocity to ≤ design (the original was too fast and drained quickly), because restrained discharge slows the level drop and makes exposure less likely, thereby keeping suction stable and preventing breaks;
6) Run a starvation test (draw down to the low limit and check the flow does not break), because the design missed the inlet elevation check and the test confirms the margin, thereby verifying the usable level;
7) Arrange dual inlets symmetrically (if one is exposed the other stays submerged), because a single inlet breaks as soon as it is exposed while dual inlets keep one submerged, thereby providing redundancy against breaks;
8) Write the minimum level and make-up interlock into the operating procedure, because the root cause of the interruption is no reserve level and no make-up, thereby the procedure controls it to prevent starvation.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping