Insufficient Vacuum in a Siphon Pipe

E44-933 · Siphon and Backflow · Siphon Pipe · ★★

Problem Description

Low vacuum, weak suction, flow stoppage

Root Cause

[Mechanism] Air leakage at the flanges and welds prevents the vacuum from building up, and the suction weakens until the flow stops.
[Calculation] A leak of d=1.5 mm draws 0.3 m³/h of air at -0.07 MPa, and in 1 h the vacuum drops from 9 m to 5 m, stopping the flow.
[Design Omission] The flanges were not tightened, the welds were not leak-tested, and no vacuum alarm was provided.

Corrective Solution

1) Tighten the flanges to the specified torque (torque per PN16), because a loose gap draws air under negative pressure while proper tightening keeps the gap <0.05 mm and leak-free, thereby keeping the seal and maintaining the vacuum;
2) Apply dye penetrant plus an airtightness test to the welds (hold 0.6 MPa with no bubbles), because porosity draws air under negative pressure and inspection and repair remove it, thereby eliminating the leak point;
3) Change the pipe sections to socket welds to reduce flanges (from 12 to 4), because flanges are the main leakage source and reducing them cuts the number of leak points, thereby reducing air leakage;
4) Replace the gaskets with corrosion-resistant PTFE (originally cracked asbestos), because the old gaskets lost their elasticity and leaked while the new ones recover, thereby blocking the leak path;
5) Provide a vacuum alarm (<7 m), because air leakage gradually lowers the vacuum before the flow stops, thereby monitoring the vacuum for early warning;
6) Perform a vacuum-holding test (stop the pump and verify the vacuum drops ≤0.5 m in 1 h), because the design omitted the check and the test confirms the leak rate, thereby judging the seal from data;
7) Prohibit flexible connections in the negative-pressure zone (change to welded bellows), because flexible joints loosen and leak while welds are stable, thereby preventing leakage in the high-risk section;
8) Write the flange tightening and airtightness into the assembly card, because the root cause of the low vacuum is uncontrolled leakage, so assembly must govern to prevent leakage and flow stoppage.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping