Multiple High Points in a Siphon Pipe

E44-943 · Siphon and Backflow · Siphon Pipe · ★★

Problem Description

Multiple high points, air accumulation, flow stoppage

Root Cause

[Mechanism] The piping has several local high points where air accumulates at multiple locations, causing multiple air locks and flow stoppage.
[Calculation] Three high points each trap 0.4 L of air; the cumulative resistance rises 4 times, and the flow drops 55% and stops.
[Design Omission] No favorable slope, no removal of the multiple high points, and no multi-point venting.

Corrective Solution

1) Make each high point smooth (remove the humps, i≥0.003), because the high points are the source of the air pockets and removing them leaves nowhere for air to collect, thereby smoothing the pipe top;
2) Install an automatic vent valve at each high point (venting on air accumulation), because multi-point air collection restricts flow and venting each point restores it, thereby eliminating the multiple air locks;
3) Change to a favorable slope so air drains with the flow (originally several adverse slopes accumulated it), because a favorable slope vents while an adverse slope traps, thereby suppressing the air;
4) Raise the flow velocity to 1.3 m/s (originally 0.9 m/s), because air tends to stagnate at low velocity and a higher velocity carries it out, thereby suppressing accumulation;
5) Provide a sight glass and a manual vent at each high point (as backup), because automatic failure requires a manual alternative as double insurance, thereby venting without relying on a single point;
6) Perform a multi-point air-lock test (fill with water and verify full passage), because the design omitted the slope and the test confirms the air is cleared, thereby verifying the venting;
7) Monitor the total flow in operation (alarm if it drops >20%), because multiple air locks first show as a flow drop before stoppage, thereby monitoring the flow for early warning;
8) Write the removal of the high points and multi-point venting into the installation card, because the root cause of multiple high points is a wrong slope without venting, so installation must govern to prevent flow stoppage.

Checklist

Reference

GB/T 20801.3-2020 Design code for industrial metallic piping