E45-130 · Power Supply · Multiple Transmitters Sharing 24V · ★
One 24V branch feeds 12 transmitters; the last 3 read low and reset occasionally, and the branch current measured 1.8A, above the supply's 1.5A rating
[Mechanism] A switching supply has a limited rated output current, and paralleling many transmitters brings the total current I_total=ΣIi close to that limit; past the limit the supply enters current-limit / foldback mode, the output voltage falls as the load rises, and the far-end transmitters misbehave on undervoltage.
[Calculation] Each transmitter draws about 20mA quiescent and 25mA peak, so 12 of them total I_total=0.3A, far below 1.5A; the measured 1.8A means one unit has an internal short leaking current and raising the total → the supply folds back on overcurrent, so find the leaking transmitter first.
[Design Omission] No supply-capacity or branch-current calculation was done: the branch had no fuse, so one faulty leaking unit dragged down the whole branch, and the supply was given no margin (it should stay ≤80% of rating).
① Calculate the supply capacity: I_total ≤0.8× rated, with a branch fuse (0.5A per transmitter) → one leaking unit no longer drags down the branch
② Split the branch across cabinets: 12 transmitters in 3 branches of 4 → ≤0.1A per branch, ample margin
③ Find the leaking transmitter: disconnect one at a time and measure the branch current to locate and replace the shorted unit → eliminates the 1.8A anomaly
④ Supply margin: choose a rating ≥1.25× I_total → it stays out of current limit at full load
⑤ Self-resetting fuse ahead of each transmitter: a 0.5A PTC → faults are isolated automatically
⑥ Measure the loaded voltage of each branch: ≥23V at full load → confirmed no foldback
⑦ Hot-standby supplies: automatic changeover between two supplies for critical branches → one failing does not stop them
⑧ Make the supply capacity and branching a mandatory item on the distribution drawing → gate at the source
GB 50054-2011