E45-233 · Wiring and Terminals · Load Cell · ★
Three signal wires were connected to the wrong positions; the instrument supplied the bridge excitation to the wrong terminals and the reading shifted by 30%
[Mechanism] The core numbers on the multi-core cable were wrong or the wires were put in the wrong holes; the excitation, signal and shield wires were misplaced, the bridge voltage from the instrument was applied to the wrong terminals, and the Wheatstone bridge went out of balance and the output shifted.
[Calculation] The correct 10V bridge voltage went to the signal terminals, so the bridge had no excitation and only leakage remained; the output shifted to 30% of rating and became nonlinear, and calibration could not pass.
[Design Omission] No core numbering, the wiring diagram did not match the hardware, and no continuity verification.
① Clear numbering: fit a numbered sleeve on every core → no mistakes
② Wire to the drawing: check every core against the wiring diagram → accurate
③ Continuity test: test each core for continuity before wiring → confirmation
④ Bridge-voltage measurement: measure 10V at the excitation terminals after wiring → confirmation
⑤ Color code: map colors to functions → prevent confusion
⑥ Two-person check: have two people check critical wires → no mistakes
⑦ Trial reading: read near zero at no load → confirmation
⑧ Write the numbering rules into the process → control at the source
GB 50168-2018 Standard for construction and acceptance of cable line installation in electrical equipment installation engineering