E45-255 · Wiring and Terminals · Lead Inside Cable Chain · ★
Reciprocating motion of the cable chain pulled continuously on the end of the lead until the copper strands broke at the root
[Mechanism] With too little slack the wire was taut at the chain's fixed point; the end took tensile stress on every stroke, and the long-term alternating tension made the root fail by fatigue.
[Calculation] With zero slack the strain at the end exceeds 1%; the copper strands have a fatigue life of about 80,000 cycles and fail within about a month on a two-shift schedule.
[Design Omission] No strain-relief slack, no cushioning at the fixed point, and no stroke evaluation.
① Leave slack: keep ≥50mm of slack at the end → not taut
② Cushioned fixing: add a sleeve at the fixed point → absorb the pull
③ Stroke check: slack ≥10% of the stroke → sufficient
④ Flexible cable: use a high-flex chain cable → withstand pulling
⑤ Pull test: verify by simulated pulling → confirmation
⑥ Break alarm: alarm immediately on a break → early warning
⑦ Root inspection: check periodically for fine breaks → early prevention
⑧ Write the slack requirement into the drawing → control at the source
GB 50168-2018 Standard for construction and acceptance of cable line installation in electrical equipment installation engineering