E45-381 · Communication and Bus · Communication Module · ★★
More nodes are connected to the RS485 bus than the driver can handle, so far-end node communication is intermittent
[Mechanism] The parallel input capacitance of the nodes makes the equivalent bus capacitance exceed the driver's capability; edges slow down and sampling goes wrong.
[Calculation] At 20 pF per node, 64 nodes give a total capacitance of 1.28 nF, above the standard; the rise time exceeds the spec and causes bit errors.
[Design Deficiency] The number of nodes and the capacitive drive capability were not budgeted.
① Capacity budgeting: nodes × capacitance ≤ drive capability → keep drive capability
② Repeater expansion: add repeaters to split the network into segments → reduce load
③ Low-capacitance nodes: choose transceivers with low input capacitance → less burden
④ Bus partitioning: split large systems into several bus segments → control scale
⑤ Stronger drive: choose transceivers with high drive capability → added margin
⑥ Load inspection: measure bus capacitance at completion → data confirmation
⑦ Capacity verification: test bit errors at full communication load → data confirmation
⑧ Selection standardization: write node capacity into the design criteria → control at the source
GB/T 19582.1-2008 Modbus protocol-based industrial automation network specification