E46-115 · Assembly Sequence & Datum · Angular Contact Bearing · ★★
The angular contact ball bearing had its lock nut tightened before the spacer was fitted, so the preload could not be controlled and the bearing ran hot and noisy.
[Mechanism] Preload should be applied by fitting the spacer for location first and then controlling the nut torque; the reversed order makes the preload uncontrollable.
[Calculation] Without the spacer for location the preload varies widely, the clearance goes negative and the temperature rises fast.
[Design gap] The preload sequence of spacer plus controlled torque was not specified.
① Spacer first: fit the equal-thickness spacer to establish the bearing axial position, then tighten the lock nut
② Set the torque: tighten the nut to the design value with a torque wrench to control the preload
③ Control the clearance: after preloading measure the actual bearing clearance and confirm it is in the negative or slight-preload range
④ Select the spacer: match-grind the spacer length to the bearing set dimensions to ensure the preload amount
⑤ Re-measure the temperature rise: after assembly run it idle and measure the temperature rise to confirm it is ≤ the specified value
⑥ In-process inspection: monitor the turning resistance during tightening to detect over-tightening early
⑦ Quality verification: confirm the preload is suitable by the temperature rise and noise
⑧ Standardize process: write the preload sequence into the assembly process, controlling at the source
GB/T 307.3-2017 Rolling bearings — General technical specifications