E46-120 · Assembly Sequence & Datum · Column Installation · ★★
The mounting face of the column required a perpendicularity of 0.02mm/1000mm, but it was set by adding shims; the accumulated error exceeded 0.1mm and the guide rail stuck in operation.
[Mechanism] Perpendicularity should be ensured by machining with only fine adjustment at assembly; improvising with shims cannot meet the requirement.
[Calculation] The shim adjustment exceeds the range of machining error, and the perpendicularity is out of tolerance.
[Design gap] It was not required to ensure perpendicularity by machining first and to limit assembly to fine adjustment.
① Ensure by machining: ensure the perpendicularity of the column mounting face by machining first, e.g. grinding to 0.02mm/1000mm
② Fine adjustment at assembly: use only thin shims for fine adjustment during assembly, never large shim corrections
③ Check perpendicularity: check the perpendicularity with a block level or square to confirm it is ≤ the requirement
④ Select the shims: use adjustable shims and keep thickness differences small to avoid local gaps
⑤ Re-test in operation: after installing the guide rail, trial-run it to check for sticking and confirm it moves smoothly
⑥ In-process inspection: re-measure the perpendicularity during alignment to detect deviation early
⑦ Quality verification: confirm the perpendicularity is acceptable by a level check and a running test
⑧ Standardize process: write machining-first-accuracy-then-assembly-fine-adjustment into the process, controlling at the source
GB/T 1182-2018 Geometrical product specifications (GPS) - Geometrical tolerancing