E46-137 · Assembly Sequence & Datum · Pin Joint · ★★
The pin was driven into one part first and the other part was then match-drilled from the pin; after separation the two holes were not coaxial and the pin could not be reused.
[Mechanism] The two parts should be fitted together, then match-drilled and reamed before the pin is driven in; driving the pin in first makes the holes mismatch.
[Calculation] The mismatch makes the pin and hole non-coaxial, so the location fails.
[Design gap] The match-fitting sequence for the assembled pair was not specified.
① Match-drill as an assembly: align the two parts and drill the pilot holes together to ensure coaxiality
② Ream as an assembly: ream the two parts together to the design hole diameter
③ Drive the pin afterward: after reaming, drive in a transition-fit pin for location
④ Mark before separating: mark the parts before separation to prevent wrong assembly
⑤ Re-check coaxiality: after driving the pin, measure the coaxiality of the two holes to confirm acceptance
⑥ In-process inspection: check the alignment during match drilling to detect deviation early
⑦ Quality verification: confirm the pin locates firmly and reliably
⑧ Standardize process: write the match-fitting sequence for assembled parts into the process specification, controlling at the source
GB/T 117-2000 Taper pins