E46-143 · Assembly Sequence & Datum · Multi-Segment Pipe Flange · ★★★
Three pipe sections were bolted directly flange to flange; the coaxiality of each section was acceptable, but when joined the accumulated offset reached 1.2mm and the flange bolts could not be inserted.
[Mechanism] Each individual section was acceptable, but the accumulated error was not controlled, so the offsets added up when they were joined.
[Calculation] Three sections at 0.4mm each accumulate to 1.2mm, exceeding the 0.5mm needed for bolt insertion.
[Design gap] No final-assembly coaxiality match fitting or adjustment was provided.
① Match-fit at final assembly: when joining multiple sections, drill and ream the connecting holes in the assembled state to ensure alignment
② Provide an adjusting section: include one adjusting section or shim to compensate the accumulated error
③ Tighten single-section errors: hold the coaxiality of each section to a stricter tolerance to reduce accumulation
④ Trial assembly: trial-fit without tightening, check the hole alignment and then tighten
⑤ Re-measure the total offset: after final assembly measure the overall coaxiality to confirm it is ≤ the requirement
⑥ In-process inspection: re-measure after each section is joined to detect the offset early
⑦ Quality verification: confirm alignment by all bolts being easy to insert
⑧ Standardize process: write final-assembly match fitting into the assembly process, controlling at the source
JB/T 5000.10-2007 General technical conditions for heavy machinery - Assembly