E46-144 · Assembly Sequence & Datum · Large Platform · ★★
A large platform was assembled on adjustable supports, but the equipment was installed without first leveling the datum; the platform tilted 0.3mm/m and the equipment ran with an offset load.
[Mechanism] Instead of leveling the datum face before assembly, the platform was left tilted, causing an offset load on the equipment.
[Calculation] A tilt of 0.3mm/m offsets the load beyond the design allowance, causing uneven wear.
[Design gap] Leveling the datum first was not specified.
① Level first: before assembly, level the mounting datum face to the required value, e.g. 0.02mm/m, using a level
② Adjust the supports: make the adjustable supports carry load evenly and avoid local gaps
③ Check the level: after leveling, re-measure in several directions with a block level to confirm acceptance
④ Secure the supports: lock the supports after leveling to prevent loosening
⑤ Re-measure under load: after installing the equipment, re-measure the level to confirm it has not changed
⑥ In-process inspection: re-measure during leveling to detect deviation early
⑦ Quality verification: confirm there is no offset load from the operating load distribution
⑧ Standardize process: write leveling the datum first into the assembly process, controlling at the source
GB/T 1182-2018 Geometrical product specifications (GPS) - Geometrical tolerancing