E46-158 · Fastening & Locking · Gearbox Split Face · ★★★
When the upper and lower gearbox housings were bolted together, the operator tightened the bolts in sequence from one end to the other, so one end of the split face was pressed down first while the other end lifted, leaving a wedge-shaped gap at the mating surface; the unit leaked oil during the trial run and the housing distorted from uneven loading.
[Mechanism] Tightening the bolts in sequence makes the joint pressure uneven: the side tightened later cannot be pressed down because the side already tightened has deformed, so a local gap forms.
[Calculation] With sequential tightening the gap at the far end can reach more than 0.2mm, exceeding the compression-rebound range of the gasket, so a leakage path opens.
[Design gap] No diagonal criss-cross, multi-pass tightening sequence was specified.
① Define the sequence: tighten the bolt group diagonally criss-cross, spreading symmetrically from the center toward both ends
② Multi-pass tightening: apply force progressively in three passes — initial, re-tightening and final — each following the diagonal sequence
③ Uniform torque: use the same final tightening torque for all bolts in the group, with a deviation no greater than ±10%
④ Use guide pins: install two locating pins first when closing the housing to ensure alignment, then tighten the bolts
⑤ Check the fit: after final tightening, check the split-face gap with a feeler gauge; no more than 0.05mm is acceptable
⑥ Apply sealant: coat the split face with anaerobic flange sealant to compensate for micro-gaps and prevent leakage
⑦ Fit verification: re-check with a feeler gauge to confirm there is no light-leaking gap at the split face
⑧ Standardize process: write the diagonal criss-cross sequence into the housing-closing work instruction
GB/T 5782-2016 Hexagon head bolts