E46-392 · Surface Treatment & Coating · Painted part · ★
The painted part showed pronounced orange peel; the thinner ratio was low and atomization poor, so leveling was insufficient.
[Mechanism] High paint viscosity coarsens the atomized droplets and shortens leveling, producing orange peel.
[Calculation] When viscosity exceeds 25 s on a Tu-4 cup, leveling is insufficient and orange peel appears.
[Design gap] The thinner ratio and gun distance were not controlled.
① Adjust thinner ratio: set the thinner ratio according to temperature to control viscosity and ensure leveling
② Control gun distance: keep the gun distance at 200mm for even atomization and fewer coarse droplets
③ Control pressure: keep the air pressure steady for fine atomization and good leveling
④ Orange-peel check: check the surface leveling to detect problems early
⑤ Re-spray: sand and re-spray orange-peel parts to restore leveling
⑥ Control temperature: apply at a suitable temperature to promote leveling
⑦ Appearance verification: confirm a level surface by visual inspection, confirmed by data
⑧ Standardize process: write the thinner ratio into the paint-mixing specification, controlling at the source
GB/T 30790.1-2014 Paints and varnishes - Protective coating systems