E46-419 · Commissioning & Run-In · Hydraulic cylinder · ★★
After assembly the cylinder was only given a short-stroke test before delivery; on full-stroke operation the piston seal wore unevenly and internal leakage let the load drift during pressure holding.
[Mechanism] A short stroke does not break in the full stroke, so the seal does not seat evenly against the bore and wears unevenly.
[Calculation] In the un-run-in section the seal's sliding speed changes abruptly and the local contact pressure exceeds the allowable value.
[Design gap] No full-stroke reciprocating run-in was performed.
① Full stroke: reciprocate the cylinder over its full stroke at least 20 times to break in the seals
② Constant speed: run in at medium speed with gentle stops at both ends to prevent impact
③ Pressure-hold test: after run-in hold pressure and check for drift, and adjust if it exceeds the limit
④ Leak check: check the piston rod for external leakage and tighten the guide if there is any
⑤ Speed check: measure the full-stroke time to confirm there is no binding at either end
⑥ Record: record the number of run-in cycles and the holding pressure
⑦ Quality verification: confirm acceptance by holding pressure without drift, confirmed by data
⑧ Standardize process: write full-stroke run-in into cylinder commissioning, controlling at the source
GB/T 3766-2015 General technical conditions for hydraulic systems