Damp Motor Insulation Breaks Down to Earth (No Drying Treatment After a Long Shutdown)

E41-168 · Motor Selection · Motor After a Long Shutdown · ★★★

Problem Symptom

The motor was restarted after a six-month shutdown (during the humid season) and tripped on an earth fault immediately on energising. The measured insulation resistance was only 0.1MΩ (≥1MΩ/kV=0.38MΩ required).

Root Cause

No moisture protection measures were taken during the shutdown (no heater band fitted, the terminal box not sealed) and the ambient humidity was 85%, so the motor winding absorbed moisture. The winding insulation material (polyester enamelled wire) absorbs moisture and the insulation resistance falls sharply. The relationship between insulation resistance and humidity is that when RH rises from 50% to 85% the insulation resistance falls by about a factor of 10. Water forms a conductive film on the winding surface, producing leakage current under the electric field → heating → the water evaporates → local drying occurs → but moisture concentrates further in the neighbouring region → eventually breakdown occurs at the weakest point of the insulation. In addition dust accumulating at the winding end forms a conductive path once damp (shortening the creepage distance) and accelerates the breakdown.

Correct Solution

1) Motors shut down for a long period (>1 month) should have a heater band fitted for moisture protection (50~100W)
2) The insulation resistance must be measured before returning to service
3) When the insulation resistance is unsatisfactory, dry the motor: hot air drying or short-circuit current drying
4) Drying acceptance criteria: insulation resistance ≥1MΩ/kV and absorption ratio R60/R15≥1.3
5) After drying a dielectric withstand test must be performed (1.5 times rated voltage for 1min)

Checklist

References

FT_12_Motor Selection Systematization