E41-346 · Screw Selection · Post-Overhaul Screw Initial Wear · ★★★
During a major overhaul the screw-nut assembly was cleaned (with kerosene) and reassembled, but it was run without sufficient grease. After 1 month the backlash grew from 0.005mm to 0.015mm.
During the overhaul the screw-nut assembly was thoroughly cleaned with kerosene (removing old grease and iron chips), but kerosene remaining inside the nut diluted the freshly added grease. Kerosene (viscosity about 1.2mm²/s) mixed with the grease (base-oil viscosity about 100mm²/s) dropped the effective grease viscosity to about 10mm²/s (90% reduction). Oil-film thickness h∝η^0.7, so a 90% viscosity drop thins the film by about 55%. Running with insufficient film thickness (boundary lubrication), the raceway surface asperities contacted directly, producing initial wear. Within 1 month the wear depth was about 0.003mm and backlash grew from 0.005mm to 0.015mm. Adequate running-in and re-greasing were not done after cleaning.
① After cleaning the screw-nut, dry it thoroughly (compressed-air purge to remove residual solvent)\n② After cleaning, add new grease and run at low speed for 30min to distribute it evenly\n③ Re-check backlash after 24h and top up the grease\n④ Recommended cleaning solvent: diesel (lower volatility than kerosene, less residue)\n⑤ Post-overhaul running-in: light-load low-speed running for 50h (initial break-in)
FT_11 Ball Screw Selection