E41-470 · Other Selection · Manual Hoist Chain Break · ★★★★★
A manually operated hoist (rated 1 t) suddenly broke its chain while lifting an 800 kg workpiece, and the workpiece fell. The chain showed obvious wear at the break, link plate thickness reduced from 4 mm to 2.5 mm.
The hoist lifting chain (Φ8 mm, grade 80, minimum breaking load ≥32 kN) suffered link-plate wear after 5 years from lack of lubrication and overloading. Meshing wear on the sprocket reduced link plate thickness from 4 mm to about 2.5 mm (37.5% wear). After wear the load-bearing section A = 2×2.5×8 = 40 mm² (2 plates per link), breaking force F_break = σ_b×A = 800×40 = 32000 N = 32 kN (grade 80 tensile strength ≥800 MPa), the standard 32 kN breaking load; after 37.5% section reduction the breaking load drops to about 20 kN. Lifting an 800 kg load, chain tension F = 800×9.8 = 7840 N ≈ 7.8 kN, plus acceleration (a ≈ 2 m/s²) increment F_acc = 800×2 = 1600 N, total ≈ 9.4 kN. 9.4 kN < 20 kN, so it should not break. Actual break cause: the most-worn link had micro-cracks (fatigue cracks about 0.5 mm deep) that fractured under 9.4 kN. Friction-wear-induced fatigue cracks were the direct cause of breakage.
① Lubricate the hoist chain regularly (add oil monthly to reduce wear).\n② Inspect chain wear (replace when link plate thickness reduced >10%).\n③ Periodic load test of the hoist (annually, 1.25× rated load).\n④ Never overload (capacity drops after wear, raising overload risk).\n⑤ Chain replacement interval: 5 years normal use (by frequency and load ratio).
FT_Machine Design Handbook