Knowledge Base › Selection Error Cases › Wrong embedded base-plate elevation causing installation difficulty (embedded plate)

Wrong embedded base-plate elevation causing installation difficulty (embedded plate)

E41-785 · Other Selection · Embedded Plate Elevation Error · ★★★

Problem Description

The equipment foundation embedded steel plate (800×800×20 mm) was 15 mm lower than design elevation, so the equipment could not be leveled during installation.

Root Cause

The embedded plate was not firmly fixed during concrete pouring (only tied to the rebar with wire), and sank 15 mm under the vibrator. During installation, after the foundation bolts passed through the plate holes, a 15 mm gap remained between the equipment base and the plate. To adjust with shims, a 15 mm shim was needed (standard shim thickness ≤5 mm); too-thick shims deform under the equipment weight (plastic deformation), so accuracy could not be guaranteed. Remedy: weld a 20 mm steel plate on top of the embedded plate (then grind flat) to restore the elevation.

Corrective Solution

① Recheck all parameters per correct selection specifications
② Confirm that operating loads, environment, and service life all meet design requirements
③ Select reliable brands and appropriate models
④ Verify installation and operating conditions
⑤ Perform periodic inspection and maintenance after commissioning

Checklist

Reference

FT_Machine Design Handbook

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL