E42-013 · Casting Defects · Hydraulic Valve Body (HT250) · ★★★
Shrinkage porosity Φ3mm on the section of the pressure-bearing cavity, causing leakage in the pressure test
[Modular Hot Spot] The modulus at the thick wall is M=V/S=3.2 while at the thin wall it is M=1.1. Since the solidification time is proportional to M², the thick region solidifies 2.6 times later and becomes a hot spot.
[Insufficient Feeding] The hot spot is far from the riser and there are no chill irons, so the feeding channel freezes early and the shrinkage cavity rate reaches 9%.
[Design Omission] No solidification simulation was done and the wall thickness ratio exceeds 3:1, so the pressure test leaks.
1) Uniform the wall thickness (ratio ≤2:1) and add transitions;
2) Add a riser plus chill irons at the hot spot to force directional solidification;
3) Optimise with ProCAST solidification simulation;
4) Increase the compaction density to reduce shrinkage porosity;
5) Radiographically inspect the pressure-bearing cavity;
6) Control the pouring temperature at 1480±20;
7) Perform first-article sectioning inspection;
8) Include solidification simulation in the casting process review.
GB/T 9439 Grey Iron Castings