E42-015 · Casting Defects · Large Gear Blank (42CrMo) · ★★★
Shrinkage cavity Φ10mm at the gear hub center, scrapped by NDT
[Riser Feeding Volume] The volume to be fed is V_need≈π×5²×10=785mm³, but the existing riser provides only V=600mm³, which is 0.76 times the requirement and therefore insufficient.
[Modulus Check] The riser modulus M_r=V/A=600/180=3.3, below 1.2× the hot-spot modulus 1.2×3.2=3.84, so directional solidification fails and the feeding channel closes early.
[Design Omission] The riser size was chosen by experience without a modulus check, scrapping the hub.
1) Raise the riser modulus to ≥1.2× the hot-spot modulus (change to V≥900mm³);
2) Add insulating riser sleeves to delay solidification;
3) Place chill irons at the hot spot to accelerate solidification of the surroundings;
4) Verify directional solidification with ProCAST simulation;
5) Perform ultrasonic inspection of the center;
6) Optimise the riser cutting process;
7) Perform first-article sectioning inspection;
8) Include the riser modulus check-up in the casting process review.
GB/T 37400 Castings for Heavy Machinery