Knowledge Base › Structural Design Error Case Study › Cooling Water Pipe Blocked by Microbial Corrosion

Cooling Water Pipe Blocked by Microbial Corrosion

E42-248 · Corrosion Failure · Circulating cooling water pipe · ★★★

Problem Description

After one year, slime fouling on the pipe wall reached 3mm thick and flow dropped 40%.

Root Cause

[Microbe] Anaerobic bacteria grew inside the pipe; slime attached and scaled to 3mm thick. [Blockage / reduced flow] Flow area decreased and flow dropped 40%. [Design Omission] No biocide dosing, low flow velocity, no pigging.

Corrective Solution

1.Periodically dose oxidizing biocide.
2.Raise flow velocity to 1.5m/s.
3.Provide pipe cleaning openings.
4.Monitor bacterial count in water.
5.Mechanically pig the pipe quarterly.
6.Change pipe material to stainless-steel-lined.
7.Control nutrients in makeup water.
8.Add side-stream filtration.

Checklist

Reference

GB/T 50050-2017