Knowledge Base › Structural Design Error Case Study › Delayed Fracture of Chemical Flange Bolt by Stress Corrosion

Delayed Fracture of Chemical Flange Bolt by Stress Corrosion

E42-296 · Corrosion Failure · Chemical flange bolt · ★★★

Problem Description

Chemical flange bolt (316) fractured delayed after 3 months in Cl⁻ medium under tensile stress; 2 bolts per month fractured

Root Cause

[Stress corrosion] Tensile stress plus Cl⁻ medium; austenitic stainless steel has low SCC threshold KISCC.
[Delayed fracture] Intergranular fracture after 3 months service, without warning.
[Design Omission] No corrosion-resistant duplex steel selected, no coating; safety factor 1.2 (should be ≥2.0).

Corrective Solution

1) Change to duplex stainless steel 2205;
2) Apply Dacromet surface coating;
3) Reduce assembly stress to 0.5σs;
4) Dechlorinate the medium;
5) Magnetic-particle inspection quarterly;
6) Check material certificates;
7) Replace with spares;
8) Replace at end of life.

Checklist

Reference

GB/T 1220-2007