Knowledge Base › Structural Design Error Case Study › Perforation and Tube Plugging by Under-Deposit Corrosion in Heat Exchanger Tubes

Perforation and Tube Plugging by Under-Deposit Corrosion in Heat Exchanger Tubes

E42-298 · Corrosion Failure · Shell-and-tube heat exchanger · ★★

Problem Description

Under-deposit corrosion on shell-and-tube heat exchanger wall; 3 tubes perforated and plugged in 2 years; 1 tube plugged per month

Root Cause

[Under-deposit] Oxygen depletion under deposit, Cl⁻ enrichment, forming occluded-cell pitting.
[Perforation] Pitting rate 0.5mm/year; perforation in 2 years (wall thickness 1mm).
[Design Omission] No water softening, no protective coating; tube plugging rate 4% (should be ≤1%).

Corrective Solution

1) Soften water (hardness ≤1.5mmol/L);
2) Add corrosion inhibitor;
3) Coat inner tube wall with protective layer;
4) Periodic chemical cleaning;
5) Measure thickness quarterly;
6) Upgrade material to titanium/316L;
7) On-line corrosion monitoring;
8) Replace at end of life.

Checklist

Reference