E43-114 · Improper Clearance Fit · Boiler Induced Draft Fan · ★
The clearance between the impeller and the inlet was designed at 3mm but measured 12mm; recirculation cut the airflow by 6%
[Large Clearance] The design clearance was 3mm, but the concentricity was not adjusted at installation, so the actual clearance reached 12mm.
[Recirculation] The large clearance let outlet air recirculate through the annular gap back to the inlet, cutting the airflow by 6%.
[Design Omission] The concentricity should have been adjusted with the clearance controlled to ≤4mm, but no coaxial assembly was done.
1) Control the clearance to ≤4mm;
2) Keep impeller-to-inlet concentricity ≤0.5mm;
3) Adjust the concentricity during installation;
4) Perform an airflow performance test;
5) Verify the airflow against the recirculation;
6) Fit a flow guide ring;
7) Re-adjust periodically;
8) Measure after installation on every batch.
GB/T 1236-2017 Fan Performance