Crane Boom Weld Side-Bow Causing Straightness Error

E43-362 · Welded/Cast Forming Dimensional Error · A boom 8000mm long, designed straightness ≤3, measured post-weld side-bow 9 · ★★

Problem Description

Uneven longitudinal shrinkage of the boom welds bows it sideways, pushing straightness 9mm out of tolerance and seizing the telescoping.

Root Cause

[Mechanism] One-sided weld shrinkage of the box boom is large, producing a side bow and pushing cross-section straightness out of tolerance.
[Calculation] Side bow f≈ΔL²/(8L)=9²/(8×8000)≈0.001 (measured as accumulated shrinkage bias 9), 3× the tolerance of 3.
[Design Omission] No symmetric welding or anti-distortion pre-bend — a design defect leading to straightness error.

Corrective Solution

1) Weld both webs symmetrically to control shrinkage bias;
2) Apply an anti-distortion pre-bend;
3) Hydraulically straighten after welding;
4) Distribute heat input evenly;
5) Add temporary rigid stiffeners;
6) Stress-relieve after welding;
7) Check straightness with a wire line;
8) Measure first-article straightness ≤3mm.

Checklist

Reference

GB/T 3811-2008 Design rules for cranes