Cavitation at the inlet of the lead pump in a series arrangement

E44-209 · Pump Selection & Cavitation · Two Centrifugal Pumps in Series D155-30x2 · ★★★

Problem Symptom

The lead pump in the series arrangement had NPSHa of 2.0m against NPSHr of 2.6m, the lead pump impeller cavitated and the system head fluctuated

Root Cause

[Cavitation] In a series arrangement the lead pump carries the entire suction-side NPSHa constraint and the second pump does nothing to improve the lead pump inlet conditions.
[Calculation] The lead pump NPSHa=Pa/rho*g-Hs-hf-Pv/rho*g=2.0m against NPSHr of 2.6m, so the bubbles collapse at the lead pump inlet.
[Design Omission] The team wrongly assumed that series operation would reduce the individual pump suction requirement and never checked the lead pump separately, so cavitation occurred.

Correct Solution

1) Check the NPSHa of the lead pump on its own: series operation does not improve the lead pump inlet, so this identifies the true constraint;
2) Select the lowest NPSHr model for the lead pump: the lead pump is the most tightly constrained, so the margin is retained there;
3) Increase the suction submergence of the lead pump: greater submergence raises NPSHa and compensates;
4) Shorten and reduce the resistance of the lead pump suction pipe: hf consumes NPSHa, so the loss is reduced;
5) Install inlet pressure monitoring on the lead pump with an interlock: the precursor of cavitation is the vacuum, so this protects the machine;
6) Where necessary add a booster pump ahead of the lead pump to raise the inlet pressure: raising the pressure is the most direct remedy, so NPSHa becomes sufficient;
7) Commission the pump and verify the lead pump inlet pressure shows no cavitation: the design requirement must be verified by measurement, so this confirms the delivery;
8) Include the separate check of the lead pump in the design: the original omission of the individual check was the root cause, so the design must always include it.

Checklist

References

GB/T 13006-2013 Centrifugal Pumps - NPSH