E44-219 · Pump Selection & Cavitation · Process Pump ZE100-65-250 · ★★
The mechanical seal flush plan 11 took the flush from the discharge and did not return it to the suction, so internal leakage disturbed the inlet, causing slight cavitation and a seal temperature rise
[Cavitation] An improper flush plan design disturbs the local pressure at the inlet and adds to the precursors of cavitation.
[Calculation] The flush return point lies close to the low-pressure region at the inlet and disturbs the flow pattern, so the local pressure momentarily falls below Pv and forms micro-cavitation.
[Design Omission] The flush plan (API Plan) selection was never checked against NPSHa, so the inlet was disturbed.
1) Select a flush plan suited to the medium and NPSHa (Plan 13 / Plan 23): different plans affect the inlet differently, so the plan is matched to the duty;
2) Locate the flush return point well away from the impeller inlet: a point near the inlet disturbs the flow, so the disturbance is avoided;
3) Use Plan 23 external circulation to avoid drawing from the suction: the suction medium is not taken, so the inlet is undisturbed;
4) Control the flush flow to the mechanical seal requirement: too much disturbs the flow, so the flow is kept appropriate;
5) Re-check that NPSHa at the inlet still meets the requirement after flushing: flushing affects the inlet, so it is reviewed;
6) Install temperature monitoring in the seal chamber: a temperature rise is a sign of internal leakage, so this provides monitoring;
7) Commission the pump and verify the inlet pressure and the seal temperature are steady: the design requirement must be verified by measurement, so this confirms the delivery;
8) Include the match between the flush plan and NPSHa in the design: the original lack of that match was the root cause, so the design must always include it.
GB/T 13006-2013 Centrifugal Pumps - NPSH