Insufficient deaerator pressure cavitates the boiler feed pump

E44-231 · Pump Selection & Cavitation · Boiler Feed Pump DG85-80x9 · ★★★

Problem Symptom

The deaerator pressure was low, so the feedwater at 104 degrees Celsius was close to saturation, NPSHa was 1.6m against NPSHr of 2.3m and the first stage cavitated

Root Cause

[Cavitation] The feedwater is close to saturation and the deaerator pressure is insufficient, so the high Pv consumes NPSHa and the first stage cavitates.
[Calculation] For water at 104 degrees Celsius Pv is about 0.117MPa; with insufficient deaerator pressure NPSHa=1.6m against NPSHr of 2.3m, so the first stage cavitates.
[Design Omission] The deaerator installation height and pressure were not matched to the feed pump NPSHr, so cavitation occurred.

Correct Solution

1) Raise the deaerator elevation to guarantee an adequate static pressure difference: the elevation difference directly contributes to NPSHa, so the margin is sufficient;
2) Keep the deaerator working pressure stable: pressure fluctuation causes cavitation, so the pressure is stabilised;
3) Select a low NPSHr feed pump type or add a booster pump ahead of it: the booster pump raises the inlet pressure, so NPSHr is satisfied;
4) Keep the feedwater line short and large-bore to reduce hf: hot water tolerates no pressure drop, so the loss is reduced;
5) Control the feedwater temperature within the design value: a temperature rise raises Pv, so the temperature is controlled;
6) Install pressure monitoring at the first-stage inlet with an interlock: it is the precursor of cavitation, so this protects the machine;
7) Commission the pump and measure the deaerator pressure and the inlet pressure, confirming no cavitation: the design requirement must be verified by measurement, so this confirms the delivery;
8) Include the matching of the deaerator to the feed pump in the design: the original lack of that match was the root cause, so the design must always include it.

Checklist

References

GB/T 13006-2013 Centrifugal Pumps - NPSH

Related 3D models: Ready to build it? Download free 3D models & CAD drawings at MOULDL »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL