E44-231 · Pump Selection & Cavitation · Boiler Feed Pump DG85-80x9 · ★★★
The deaerator pressure was low, so the feedwater at 104 degrees Celsius was close to saturation, NPSHa was 1.6m against NPSHr of 2.3m and the first stage cavitated
[Cavitation] The feedwater is close to saturation and the deaerator pressure is insufficient, so the high Pv consumes NPSHa and the first stage cavitates.
[Calculation] For water at 104 degrees Celsius Pv is about 0.117MPa; with insufficient deaerator pressure NPSHa=1.6m against NPSHr of 2.3m, so the first stage cavitates.
[Design Omission] The deaerator installation height and pressure were not matched to the feed pump NPSHr, so cavitation occurred.
1) Raise the deaerator elevation to guarantee an adequate static pressure difference: the elevation difference directly contributes to NPSHa, so the margin is sufficient;
2) Keep the deaerator working pressure stable: pressure fluctuation causes cavitation, so the pressure is stabilised;
3) Select a low NPSHr feed pump type or add a booster pump ahead of it: the booster pump raises the inlet pressure, so NPSHr is satisfied;
4) Keep the feedwater line short and large-bore to reduce hf: hot water tolerates no pressure drop, so the loss is reduced;
5) Control the feedwater temperature within the design value: a temperature rise raises Pv, so the temperature is controlled;
6) Install pressure monitoring at the first-stage inlet with an interlock: it is the precursor of cavitation, so this protects the machine;
7) Commission the pump and measure the deaerator pressure and the inlet pressure, confirming no cavitation: the design requirement must be verified by measurement, so this confirms the delivery;
8) Include the matching of the deaerator to the feed pump in the design: the original lack of that match was the root cause, so the design must always include it.
GB/T 13006-2013 Centrifugal Pumps - NPSH