Insufficient pressurization of the suction tank causes cavitation

E44-241 · Pump Selection & Cavitation · Closed suction tank transfer pump IH65-40-250 · ★★★

Problem Symptom

The nitrogen blanket pressure of the closed suction tank was insufficient (design 0.05MPa gauge, actual 0.01), NPSHa fell by 1.4m and the pump cavitated

Root Cause

[Cavitation] Insufficient pressurization of the suction tank lowers the static pressure at the inlet, so the Pa/ρg term of NPSHa is insufficient and the pump cavitates.
[Calculation] When the tank pressure falls from 0.05 to 0.01MPa, Pa/ρg drops by about 4m and NPSHa falls by the corresponding 1.4m to below NPSHr, so cavitation occurs.
[Design Omission] The nitrogen blanket pressure control was unstable and set too low, so the tank was not pressurized enough.

Correct Solution

1) Hold the suction tank nitrogen blanket pressure at the design value with stable pressure regulation, because the tank pressure directly supplies NPSHa, thereby making up the deficit;
2) Fit an automatic make-up pressure regulator on the nitrogen blanket, because manual regulation drifts, thereby keeping the pressure stable;
3) Check NPSHa against the lowest tank pressure, because the low-pressure case is the most severe, thereby covering the worst case;
4) Add a low tank pressure alarm interlock, because insufficient pressure causes cavitation, thereby giving early warning;
5) Where necessary, raise the liquid level in the tank to assist NPSHa, because the elevation difference makes up the deficit, thereby increasing the margin;
6) Install inlet pressure monitoring as a cavitation early-warning, because the tank pressure fluctuates, thereby protecting the pump;
7) Measure the tank pressure and inlet pressure during commissioning to confirm compliance, because the design requirement must be verified by measurement, thereby closing out the acceptance;
8) Incorporate nitrogen blanket pressure control into the design, because the original insufficient pressurization is the root cause, so the design must include it.

Checklist

References

GB/T 13006-2013 Centrifugal Pumps - NPSH