Hot water recirculation raises the inlet temperature and causes cavitation

E44-249 · Pump Selection & Cavitation · Hot water pump IRG100-200 · ★★★

Problem Symptom

At low flow the recirculated hot water flowed back into the suction, the inlet water temperature rose 6℃, Pv rose, NPSHa fell by 1.3m and the pump cavitated

Root Cause

[Cavitation] At low flow the recirculation returns hot water to the suction side, the inlet temperature rises, Pv increases, NPSHa falls and cavitation follows.
[Calculation] A 6℃ rise in the recirculation return temperature increases Pv by about 0.015MPa and lowers NPSHa by about 1.3m to below NPSHr, so cavitation occurs.
[Design Omission] The recirculation return point was neither cooled nor located away from the suction, so the return water reheated the inlet.

Correct Solution

1) Return the recirculation flow through a cooler before it reaches the suction, because cooling keeps Pv from rising, thereby keeping NPSHa stable;
2) Connect the recirculation return at the far end of the suction tank rather than at the pump inlet, because distant mixing cools the water, thereby reducing the effect on the inlet;
3) Limit the recirculation flow to the minimum required, because the more that is returned the greater the temperature rise, thereby reducing the heat return;
4) Check NPSHa for the temperature rise under recirculating conditions, because the temperature rise lowers NPSHa, thereby covering the case;
5) Add an inlet temperature monitor with interlock, because the temperature rise causes cavitation, thereby protecting the pump;
6) Prefer VFD control in place of recirculation, because speed control does not return heat, thereby eliminating the problem at the root;
7) Measure the inlet temperature and pressure under recirculating conditions during commissioning to confirm there is no cavitation, because the design requirement must be verified by measurement, thereby closing out the acceptance;
8) Incorporate the recirculation return design into the scheme, because the heat return was the root cause, so the design must include it.

Checklist

References

GB/T 13006-2013 Centrifugal Pumps - NPSH