No summary check at selection, so several adverse factors stack up and cavitate

E44-252 · Pump Selection & Cavitation · Centrifugal pump IS150-125-315 for a combined duty · ★★★

Problem Symptom

High temperature, high altitude and a long suction line acted together; each factor on its own was marginal, but the combined NPSHa was 1.0m against NPSHr of 2.5m

Root Cause

[Cavitation] Several adverse factors are each marginal in isolation, but in combination they reduce NPSHa severely and cavitation occurs.
[Calculation] NPSHa=Pa/ρg-Hs-hf-Pv/ρg; the three factors of low Pa at altitude, high Pv at high temperature and a large hf over a long line stack up to 1.0m.
[Design Omission] The selection did not carry out a summary check of the individual NPSHa terms and estimated each one separately, so the stacked cavitation occurred.

Correct Solution

1) Carry out an item-by-item summary check of NPSHa (counting Pa, Hs, hf and Pv in full), because the factors stack up, thereby capturing the true value;
2) Check against the most severe combination of conditions, because the combination is the most dangerous, thereby covering the extreme case;
3) Optimise each term in turn (reduce hf, increase submergence, lower Pv, choose a lower NPSHr pump), because every term contributes, thereby improving the result in combination;
4) Keep a combined margin of at least 0.5m, because the fluctuation of several factors stacks up, thereby covering the boundary case;
5) Prepare an NPSHa calculation sheet listing every sub-term, because it must be traceable, thereby ensuring no term is omitted;
6) Install inlet pressure monitoring with a cavitation interlock, because the stacked factors make cavitation likely, thereby protecting the pump;
7) Measure under the actual combined duty during commissioning to confirm there is no cavitation, because the design requirement must be verified by measurement, thereby closing out the acceptance;
8) Make the NPSHa summary check a mandatory item in the selection standard, because estimating single terms only was the root cause, so the design must include it.

Checklist

References

GB/T 13006-2013 Centrifugal Pumps - NPSH

Related 3D models: Ready to build it? Download free 3D models & CAD drawings at MOULDL »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL