E44-055 · Excessive Piping Resistance & Pressure Drop · Process water line · ★★
The DN80 pipe was too small, giving v=3.2m/s against a design velocity of 2m/s; hf was 1.6 times the design value, so the pump consumed more power and the end of the line was short of pressure
[Velocity Effect] v=Q/A, so a small pipe diameter gives a high v and hf∝v².
[Calculation] DN80 gives v=3.2m/s, and hf is (3.2/2.0)²=2.56 times the value for DN100 (v=2.0); the measured value is 1.6 times higher because the pipe lengths differ.
[Design Omission] The pipe diameter was not selected on the design velocity and hf was not checked, so the pressure drop is large.
1) Enlarge the pipe from DN80 to DN100, because the area increases 56% and the velocity falls from 3.2m/s to 2.0m/s, so hf drops by a factor of (2.0/3.2)²=0.39, restoring the end pressure and reducing the pump power consumption;
2) Re-select the pump head and power for the new resistance, because the enlarged pipe flattens the system curve and shifts the operating point of the original pump, thereby matching the new duty and avoiding both an oversized pump running small and an overload;
3) Control the design velocity within 1.5 to 2.5m/s, because friction is low in that band and the pressure drop and energy consumption are optimum in combination, thereby giving the pipe sizing a quantitative basis;
4) Account for both friction and local losses and issue a calculation sheet, because estimating the pipe diameter alone easily omits the local losses so the actual drop remains high, thereby locking down the total resistance with a calculation sheet;
5) Install pressure measurement points along the line, because the actual pressure drop must be verified after the modification, thereby comparing it against the design value and confirming compliance;
6) Measure the actual flow and pressure drop and plot the duty points, because the flow varies with the season and a single point does not cover the whole range, thereby characterising the full operating range;
7) Measure the pump power consumption and the end pressure during commissioning, because energy use is the core metric of the modification, thereby quantifying the energy saving and the supply assurance;
8) Incorporate the design velocity into the pipe sizing standard, because the original failure to check the design velocity is what left the pipe too small, thereby preventing recurrence through the process.
GB/T 20801-2020 Pressure Piping Code