E44-106 · Excessive Piping Resistance & Pressure Drop · DN300 plant water transmission main · ★★
The design friction factor was λ0.020 but the measured value was λ0.028 (scaling inside the pipe), the pressure at the end was 0.18MPa against a design 0.30MPa and the supply was insufficient
[Roughness] Scaling inside the pipe increases ε and raises λ.
[Calculation] hf=λL/d·v²/2g, and λ0.028 is 40% above 0.020, so hf exceeds the design value.
[Design Omission] No roughness allowance was reserved, so the end was short of pressure.
1) Check λ against the actual roughness ε and allow a factor of 1.5, because scaling raises λ, thereby giving hf a margin;
2) Enlarge the pipe diameter appropriately to bring v down to the design velocity (1.5 to 2.5m/s), because hf∝v², thereby lifting the pressure at the end back up;
3) Install an intermediate booster station to make up the pressure, because the loss over a long distance is large, thereby bringing the end up to the design pressure;
4) Install pressure measurement points along the line for monitoring, because they reveal the pressure drop distribution, thereby enabling early action;
5) Line the inner wall to reduce the roughness, because a smaller ε gives a smaller λ, thereby reducing hf;
6) Pig the line at regular intervals to remove the scale, because scale raises ε, thereby holding λ down;
7) Measure the end pressure ≥0.30MPa during commissioning, because the design requirement must be verified by measurement, thereby closing out the acceptance;
8) Include the roughness allowance in the hydraulic calculation sheet, because it must be traceable, thereby ensuring no item is omitted in future.
GB/T 20801.3-2020 Pressure Piping Code - Design of Industrial Piping