E44-992 · Vessel Strength and Wall-Thickness Deficiency · Nozzle · ★★★
Short protrusion, high stress, cracking
[Mechanism] The nozzle protrusion was too short; the root bending moment could not spread out, and local bending stress exceeded allowable and cracked.
[Calculation] Protrusion length L=80mm, less than 2.5δ=150mm; root σ=195MPa exceeds [σ]=185MPa, bending moment concentrated.
[Design Omission] The nozzle was not lengthened, no protrusion check, and no reinforcement.
1) Lengthen the nozzle protrusion to L≥2.5δ=150mm (was 80mm), since a short protrusion concentrates stress and a longer one spreads it — thus lowering stress;
2) Check the protrusion length (L≥2.5δ to control bending moment), since a short length stresses and the check sets it right — thus compliant;
3) Add root reinforcement (R≥3δ transition), since a weak root stresses and reinforcement raises strength — thus reinforcing;
4) Switch to a smooth transition (no sharp corner), since a sharp corner cracks and a transition eases it — thus lowering stress;
5) Perform MT on the nozzle zone (no cracks), since cracks first show as lines and can be rejected early — thus finding cracks;
6) Run a hydrotest (1.25× design pressure), since the short protrusion caused cracking and measurement confirms stability — thus setting strength by data;
7) Control nozzle reaction loads (share via supports/hangers), since an added load stresses and sharing lowers it — thus reducing load;
8) Write the protrusion and stress into the calculation book, since the short-protrusion stress root cause was the too-short L and missed check — thus locking it in at design.
GB/T 150.1-2011 Pressure vessels