Vibration, hammer, noise.
[Mechanism] The surge tank was undersized or not pre-charged with gas; weak water-hammer absorption made the pipe vibrate.
[Calculation] Tank volume 0.5m³ (should be 2); pre-charge pressure 0 (should be 0.4); water-hammer ΔP absorbed only 20%; pipe vibration 0.4mm.
[Design Omission] No volume check, no gas charge, and no inspection.
1) Check sufficient volume (≥2m³); small volume vibrates, and adequate volume absorbs, damping vibration;
2) Control gas pressure (pre-charge 0.4MPa); low gas pressure causes hammer, and pressure control absorbs it, suppressing hammer;
3) Add supports to stabilize (anchor the tank base); looseness vibrates, and stable support fixes the tank;
4) Check position high (near pump outlet); a low position causes hammer, and a checked position absorbs it, suppressing hammer;
5) Run a vibration test (amplitude ≤0.15mm); vibration was unchecked, and measured stability confirms it;
6) Fit vibration monitoring (alarm on threshold), since vibration first shows as amplitude for early warning, monitoring and alerting;
7) Control inlet steadily in operation (gradual flow change); impingement vibrates, and a controlled inlet stabilizes, preventing vibration;
8) Record volume and pressure control on the surge-tank drawing; the root cause of vibration was small volume and no gas charge, so the drawing must gate it.
GB/T 150-2011 Pressure vessels