E44-1092 · Other · Condensate Drain Line · ★★
Frozen, cracked, leaking.
[Mechanism] The condensate drain had no heat tracing and insufficient slope; water pooled at low points, froze and expanded about 9%, and hoop stress exceeded the allowable, causing cracking and leakage.
[Calculation] Pipe DN20, wall 2.0mm; ice expansion raised internal pressure to about 12MPa; σ=pd/2t=12×20/(2×2)=60MPa>allowable 45MPa, causing cracking and leakage.
[Design Omission] No insulation/tracing, no slope check, no drain interval set, and no freezing test.
1) Provide electric heat tracing (15W/m, constant 60℃); cold freezes, and tracing melts it, preventing freeze-cracking;
2) Check slope ≥3‰ (was near 0); a flat line pools, and adequate slope drains it, leaving no pooling;
3) Add insulation (δ=30mm rubber/plastic); radiation freezes, and insulation protects, suppressing freezing;
4) Control drain frequency (every 2h); long intervals pool, and frequent draining cleans it, preventing pooling;
5) Run a freezing test (−20℃ held 24h without cracking); untested means unknown, and measured toughness confirms it;
6) Install temperature monitoring (alarm <5℃); freezing first shows as a temperature drop, and early warning catches it;
7) Set an inspection interval (before winter); long intervals degrade, and controlled intervals inspect, preventing freezing in service;
8) Record tracing and slope on the condensate-drain drawing; the root cause of freeze-cracking was no tracing and a flat slope, so the drawing must gate it.
GB/T 4272-2008 Thermal insulation for equipment and pipelines