E44-1098 · Other · Conveying Pipe · ★★
Blocked, conveying, stopped.
[Mechanism] Slurry velocity was below the critical settling velocity; solids settled and blocked the line, stopping conveyance.
[Calculation] Pipe DN100, slurry concentration 15%; critical velocity v_c=1.8m/s; actual v=1.1m/s<v_c; settling rate 8%/h; fully blocked in 3h.
[Design Omission] No critical-velocity check, no flushing, no bore check, and no conveyance test.
1) Control velocity ≥2.0m/s (>v_c=1.8); low velocity blocks, and adequate velocity suspends solids, preventing settling;
2) Provide a flushing line (flush on pump stop); deposition blocks, and flushing cleans it, restoring conveyance;
3) Check bore DN150 (replacing DN100 to cut resistance); a small bore blocks, and an adequate bore keeps it open, conveying freely;
4) Control solids content ≤12% (was 15%); high content settles, and lower content suspends it, preventing blockage;
5) Run a conveyance test (24h continuous without blockage); untested means unknown, and measured flow confirms it;
6) Install differential-pressure monitoring (alarm on sudden ΔP rise); a blockage first shows as pressure rise, and early warning catches it;
7) Set a cleaning interval (every shift); long intervals block, and controlled intervals keep it clean, preventing blockage;
8) Record velocity and flushing on the conveying drawing; the root cause of blockage was sub-critical velocity and no flush, so the drawing must gate it.
GB/T 50050-2017 Industrial circulating cooling water