E44-1108 · Other · Dosing Pump · ★★
Blocked, dosing, unable.
[Mechanism] The solution carried crystals and the inlet was unfiltered; the check valve jammed and the metering pump stopped dosing.
[Calculation] Pump rated 0.5m³/h; after valve blockage actual 0.1m³/h (only 20%); dosing concentration fell from 50ppm to 10ppm.
[Design Omission] No filtration, no flushing, no valve-type check, and no dosing test.
1) Add filtration (200μm) against blockage; crystals block, and filtering cleans it, restoring dosing;
2) Provide a flush line (daily); deposition blocks, and flushing opens it, restoring output;
3) Check valve type (wear-resistant check valve); a small valve blocks, and a matched valve flows, dosing;
4) Raise stroke opening (full stroke); a closed stroke blocks, and opening it doses;
5) Run a dosing test (flow ≥0.45m³/h); untested means unknown, and measured output confirms it;
6) Install flow monitoring (alarm on bias); a blockage first shows as output drop, and early warning catches it;
7) Set a cleaning interval (weekly); long intervals block, and controlled intervals keep it clean, preventing blockage;
8) Record filtration and flushing on the dosing drawing; the root cause of no dosing was no filtration and a jammed valve, so the drawing must gate it.
GB/T 7782-2008 Metering pumps