E44-333 · Excessive Piping Resistance and Pressure Drop · Multiple units starting at once (peak) · ★★
Five units starting together make the instantaneous total flow 3× the average; hf=0.4MPa exceeds the design 0.15 and the header pressure drops
[Mechanism] Simultaneous start makes ΣQ three times the average; v rises and hf∝v² spikes.
[Calculation] hf=0.4 exceeds 0.15, dropping the header pressure.
[Design Omission] No staggered start and no peak-based sizing - the peaks stacked.
1) Stagger unit starts and hold the simultaneity factor ≤0.6, since simultaneous start made ΣQ=3× and hf=0.4 exceed 0.15, staggering to cut the peak;
2) Size the header for peak total flow, since the large peak Q needs a bigger pipe, sizing for peak;
3) Add a buffer tank to smooth the transient, since the sudden peak is hard to absorb, buffering it;
4) Drive pumps on VFD to follow the peak, since fixed speed overloads at peak, using variable speed;
5) Check peak hf with margin, since the peak causes overdesign, leaving margin;
6) Zone the supply by pressure, since full-pressure stacking is worse, zoning the supply;
7) Add pressure monitoring to detect the drop early, since the peak causes the drop, monitoring pressure;
8) Write the peak factor into the design, since the missing control was the root cause, closing the loop at design.
GB/T 20801.3-2020 Design code for industrial metallic piping