E44-606 · Seal Leakage · Mechanical Seal Piping Plan · ★★
Seal cavity temperature high and leaking, wrong plan
[Mechanism] The wrong piping plan lets the seal cavity overheat.
[Calculation] The high temperature breaks the film and it leaks.
[Design Omission] No plan was selected, the piping was not routed and it was not tested - the plan was wrong.
1) Change to Plan 11 self-flushing (piped from the pump discharge with an orifice to set the flow); the original plan left the seal cavity without cooling, the temperature rose and the film broke, so self-flushing cools it and preserves the film;
2) Route the flushing pipe to guarantee 1L/min (pipe diameter sized from the flow); without flow the cavity overheats, and routing the pipe provides it;
3) Control the cavity temperature at <=70C (temperature transmitter with a pump trip interlock); a high temperature breaks the film, and cooling prevents that;
4) Select a suitable plan (Plan 53 or 52 with barrier fluid for hazardous duties); a wrong plan leaks, and the correct plan prevents that;
5) Add flushing filtration (100 mesh); dirt raises the temperature, and filtering prevents it;
6) Monitor the temperature with an alarm (alarm above 70C); a high temperature causes leakage, and monitoring gives warning;
7) Carry out a plan verification test (confirm the temperature differential in operation); without the test the wrong plan stayed, so the test verifies the plan;
8) Write the plan selection and the piping into the specification; the original failure to select a plan was the root cause of the error, so the specification closes the loop.
API 682-2014 Mechanical Seals for Pumps (Plan)