E44-116 · Water Hammer and Pressure Surge · Long-Distance Water Pipeline · ★★
Closure time 8s (<2L/c=20s); the water-hammer peak of 1.9MPa exceeds the pipe rating of 1.6MPa, and the flange gasket leaks.
[Valve Closure] Fast closure produces a large Δv.
[Calculation] Δp=ρcΔv; when T<2L/c the instantaneous water-hammer peak exceeds the rating.
[Design Omission] The closure time was not controlled — leakage resulted.
1) Control the closure time T>2L/c (e.g., 20s): with sufficient T, Δv changes slowly and Δp drops, keeping the peak within the rating;
2) Use slow-closing or two-stage closure: staged reduction of Δv suppresses the hammer;
3) Install a water-hammer arrester: it absorbs the shock wave, protecting the piping;
4) Raise the strength of joints and welds: the peak pressure impacts them, so stronger joints resist cracking;
5) Interlock valve position with pressure: the valve closes on overpressure, ensuring safety;
6) Install pressure monitoring points along the line: the peak pressure can be known and checked;
7) Run a commissioning test to measure the water-hammer peak ≤ pipe rating: the design requirement must be verified on site;
8) Include valve-closure characteristics in the water-hammer analysis: rapid closure was the main cause, institutionalizing prevention.
GB/T 20801.3-2020 Pressure piping code - Industrial piping - Design