E44-167 · Water Hammer and Pressure Surge · Steam Piping · ★★
Poor drainage during warm-up lets liquid slugging vibrate the piping, loosen supports, and crack elbows.
[Liquid Slugging] Condensate accumulated at the pipe bottom is driven by the steam into a slug impact.
[Vibration Cracking] The impact loosens, bends, and cracks the supports.
[Design Omission] The line was not warmed up and drained sufficiently, and no steam traps were provided — slugging resulted.
1) Warm up the line thoroughly before service, raising temperature gradually and draining condensate: accumulated water is driven into slug impacts and cracking, so warm-up and draining prevent it;
2) Install start-up steam traps at low points for continuous drainage: accumulated water causes slugging, so trapping prevents accumulation;
3) Limit the warm-up rate to ≤50℃/h to prevent sudden heating: sudden heating drives accumulated water, so the rate is controlled;
4) Check and densify supports against impact loading: vibration loosens them, so supports are checked;
5) Provide slugging monitoring and alarm: vibration precedes slug impacts, so monitoring alerts;
6) Slope the pipe bottom toward traps to prevent accumulation: flat slopes let water collect, so a clear slope is used;
7) Run a commissioning test to verify that warm-up produces no slugging: the design requirement must be verified on site;
8) Include warm-up and condensate draining in the start-up procedure: the original lack of draining was the root cause of slugging, so it is mandatory.
GB/T 20801-2020 Pressure piping code