E44-353 · Water Hammer and Pressure Surge · Centrifugal Pump IS100-80 Trip · ★★★
After pump trip the check valve seats 2s late; the water hammer Δp=ρcΔv=1.2MPa (pipe allowable 1.0) blows out three flange gaskets.
[Water Hammer] On pump trip the velocity drops abruptly from 2m/s, and the pressure wave Δp=ρcΔv=1.2MPa exceeds the allowable.
[Late Disc Seating] The check valve seats 2s late, letting reverse-flow impacts stack up.
[Design Omission] A fast-closing check valve was not used and no surge arrester was provided — pump-trip hammer resulted.
1) Replace with a fast-closing check valve seating <0.5s: the original 2s delay produced Δp=1.2 exceeding 1.0 and blew three gaskets; fast closure cuts off reverse flow;
2) Install a water-hammer arrester at the pump discharge to cut the peak: the wave amplitude exceeds the allowable, so it absorbs the peak;
3) Close the discharge valve first, then stop the pump: stopping directly generates the wave, so close-then-stop is used;
4) Check Δp=ρcΔv with margin ≤ allowable: the original lack of calculation caused the exceedance, so accurate calculation is used;
5) Provide fixed supports to resist impact: the wave transmits vibration, so the pipe is anchored;
6) Tune the slow-closing valve to 3~5s closure: fast closure also impacts, so a moderate slow closure is used;
7) Periodically test check-valve seating: pin wear causes delay, so seating is tested;
8) Write water-hammer protection into the design: the original omission was the root cause of the hammer, so design review enforces it.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection