E44-355 · Water Hammer and Pressure Surge · Horizontal Centrifugal Pump Direct Start · ★★
Direct start-up jumps flow from 0 to rated, generating a pressure wave Δp=0.8MPa, vibrating the discharge pipe and leaking gaskets.
[Start-Up] Flow jumps 0→rated, so v rises abruptly and the wave Δp=0.8 is generated.
[Vibration Leakage] The wave vibrates the pipe and leaks gaskets.
[Design Omission] No soft start and no cracked-open valve were provided — start-up hammer resulted.
1) Use pump soft start to limit acceleration and smooth Δv: direct start made v jump, Δp=0.8 and leakage; slow start lowers the wave;
2) Crack open the discharge valve and open it gradually after start: closed-valve direct start causes damage, so a cracked-open start is used;
3) Check start-up Δp=ρcΔv with margin: the original lack of calculation caused leakage, so accurate calculation is used;
4) Install a surge arrester to cut the start wave, because start-up also generates hammer; hence peak absorption;
5) Anchor the pipe with fixed supports against start-up vibration: start-up vibration transmits, so the pipe is anchored;
6) Use VFD start-up for smoother operation: fixed-frequency start is abrupt, so VFD is used;
7) Periodically test the start-up curve: drift makes it abrupt, so start-up is tested;
8) Write soft start into the control logic, because the original direct start was the root cause of the hammer; hence control discipline.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection