E44-356 · Water Hammer and Pressure Surge · Air tank, leaking intake valve · ★★
A leaking air-tank intake valve depressurized the air chamber, the cushioning failed, and at pump shutdown Δp=1.3MPa exceeded the allowable limit, cracking the tank weld.
[Mechanism] The leaking intake valve left the air chamber with no gas, so it could not absorb the surge.
[Calculation] Δp=1.3 exceeded the allowable limit and caused the crack.
[Design Omission] The air chamber was not kept sealed and the precharge pressure was never checked, so the tank failed.
1) Repair the intake valve to keep the air chamber sealed and set the precharge pressure; because the leak let the gas escape, drove Δp=1.3 beyond the allowable limit and cracked the tank, this retains the gas to absorb the surge;
2) Periodically measure the air-chamber pressure to catch leaks early, because a leak grows unnoticed; hence pressure testing;
3) Verify the absorption volume ≥ the surge volume, because a small volume cannot absorb; hence adequate volume;
4) Provide a standby twin tank, because a single tank failure is risky; hence dual protection;
5) Thicken the tank wall for surge pressure, because overpressure cracks it; hence extra thickness;
6) Close the valve before stopping the pump, because a direct stop generates water hammer; hence close first;
7) Recheck the volume by water-hammer simulation, because estimates fall short; hence simulation;
8) Put air-chamber maintenance into the procedures, because the lack of it was the root cause of the pressure loss; hence procedural control.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection