E44-358 · Water Hammer and Pressure Surge · 8km long pipeline, two-stage pumps · ★★★
Pump shutdown on the 8km line produced a peak Δp of 1.4MPa along the route, overpressured an intermediate valve station, and burst two branch pipes.
[Mechanism] A long pipe gives a long wave travel time, a high peak, and multiple overpressure points.
[Calculation] The 1.4 peak exceeded the branch allowable limit and caused bursting.
[Design Omission] No protection was installed along the route and no simulation was run, leaving the long pipeline to suffer water hammer.
1) Install surge arresters every 2km along the route for staged protection, because the 8km line produced a 1.4 peak beyond the branch limit and burst two points; hence staged peak cutting;
2) Run a full-pipeline water-hammer simulation to find peaks and place protection, because hidden peaks are hard to spot; hence simulated placement;
3) Raise the branch pressure rating or add relief, because the branch allowable is low; hence higher rating;
4) Use a staged pump-shutdown sequence that closes first and then stops, because a direct stop generates hammer; hence staging;
5) Check the Δp distribution along the route, because the peak changes with position; hence distribution calculation;
6) Add an overpressure interlock at valve stations, because station overpressure is risky; hence interlock;
7) Periodically simulate stop/start curves, because drift raises peaks; hence curve rehearsal;
8) Write long-pipeline protection into the design, because the lack of it was the root cause of the hammer; hence design control.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection