E44-365 · Water Hammer and Pressure Surge · Steam line, condensate not drained · ★★★
Steam carrying water caused water hammer Δp=1.1MPa, support displacement, three flange leaks, and noise of 110dB.
[Mechanism] Steam meeting condensate drives a slug of water at high speed into a bend, producing Δp=1.1.
[Calculation] The impact caused flange leaks and 110-level noise.
[Design Omission] No condensate drainage and no pipe warm-up were provided, so the steam line suffered water hammer.
1) Warm up the pipe and fully drain condensate before commissioning, because the condensate was driven by steam into impacts, Δp=1.1, three leaks and 110 noise; hence drainage eliminates the hammer;
2) Install steam traps at low points for continuous drainage, because condensate is the source of the hammer; hence constant draining;
3) Limit steam velocity during ramp-up to prevent driving water, because high speed pushes slugs; hence speed limiting;
4) Lay the pipe with a slope to aid drainage, because flat pipes hold condensate; hence sloped layout;
5) Check the water-hammer Δp and raise the rating, because the exceeded limit caused leaks; hence higher rating;
6) Reinforce supports to resist impact displacement, because the impact moved them; hence strengthened supports;
7) Provide a water-hammer alarm, because hidden hammer is risky; hence alarm;
8) Put condensate draining and pipe warm-up into the procedures, because the lack of drainage was the root cause of the hammer; hence procedural control.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection