E44-372 · Water Hammer and Pressure Surge · High-point air pocket, start-up hammer · ★★
An air pocket at the high point was compressed on pump start, colliding to generate Δp=1.0MPa beyond the allowable limit, and vibrating/leaking at the high-point pipe.
[Mechanism] Air trapped at the high point is compressed by the start-up wave and collides, generating hammer.
[Calculation] Δp=1.0 exceeded the allowable limit and caused leakage.
[Design Omission] No air vent and no high-point valve were provided, so air hammer occurred.
1) Fit an automatic air vent at the high point to purge the air, because the air pocket was compressed and collided, Δp=1.0 exceeded the limit and leaked; hence venting eliminates the hammer;
2) Lay the pipe on a slope so air rises, since flat lines trap air, sloping the layout;
3) Vent the air before starting the pump, because air causes hammer; hence vent first;
4) Install a surge arrester to cut the start wave, because start-up also generates hammer; hence peak absorption;
5) Check the air-containing start Δp and up-rate the rating, because the exceeded limit leaked; hence higher rating;
6) Brace the high-point pipe supports against vibration, because vibration causes leakage; hence braced supports;
7) Recheck by water-hammer simulation, because estimates fall short; hence simulation;
8) Write air venting into the design, because the lack of venting was the root cause of the hammer; hence design control.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection